Cement Slab Pouring Quotes

Get Professional Services

Our Trusted Partners
Novela Concrete

Cost of Cement Slab Pouring in Burnsville

Pouring a cement slab in Burnsville, MN, involves various considerations that can impact the overall cost. From the size of the slab to local labor rates, understanding these factors can help you budget more accurately for your project.

Factors Affecting Cost

  • Size of the Slab: Larger slabs require more materials and labor, increasing the overall cost.
  • Thickness of the Slab: Thicker slabs use more concrete, affecting the price.
  • Concrete Grade: Higher-grade concrete is more durable but also more expensive.
  • Labor Rates: Local labor costs in Burnsville, MN, can vary, influencing the total expense.
  • Site Preparation: Costs can rise if significant site preparation is needed, such as excavation or leveling.
  • Reinforcement: Adding rebar or wire mesh for reinforcement increases material costs.
  • Permits and Inspections: Local regulations may require permits and inspections, adding to the cost.
  • Finishing: Different finishing techniques, such as stamping or staining, can add to the expense.

Average Costs for Common Tasks

Task Average Cost in Burnsville, MN
Pouring a basic 10x10 slab $1,200 - $1,800
Pouring a 20x20 driveway $3,500 - $5,500
Adding rebar reinforcement $0.50 - $1.00 per sq. ft.
Stamped concrete finish $8 - $12 per sq. ft.
Site preparation $500 - $1,500
Permits and inspections $100 - $300
Concrete delivery fee $75 - $150

Understanding these elements will help you better estimate the cost of your cement slab project in Burnsville, MN.

Cement Slab Pouring